Nolden Construction is nearly done with the remodeling. The HVAC went in over the weekend, and this morning the lights were installed. March 29, 2021.
Election updates for the 2021 Spring Election
The first week of in person absentee voting is done – a total of 88 absentee ballots have been issued, and 40 have been returned. You can check the status of your ballot on myvote.wi.gov.
The Town Hall will be open every weekday next week (March 29, 2021 – April 2, 2021, inclusive) for voting and voter registration from 10 to noon and from 2 to 4. No appointment is necessary. If those times do not work, feel free to call 608-424-3848 to set up a time that does work.
Election Day is April 6th, with polls open from 7 am to 8 pm. We will be in our newly remodeled facilities, which are nearly done.
Notice of Public Test
The public test of our voting equipment will be held on March 31, 2021 at 1:30 at the Montrose Town Hall, 1341 Diane Avenue, Belleville WI 53508. Everyone is welcome to attend.
https://townofmontrose.com/wp-content/uploads/2021/03/March-31-2021-Public-Test-Notice.pdf
April 6, 2021 Spring Election
Election Day is April 6, 2021. Vote that day at the Montrose Town Hall in Paoli any time between 7 am and 8 pm. The races are for State Superintendent of Public Instruction, County Executive, and the various school boards in the township. Up for election, unopposed, are several Dane County judges and the members of township government.
Mail in absentee ballots can be requested through myvote.w.gov any time through March 31, 2021; but ask earlier rather than later – any ballot not returned to the town hall by 8 pm on April 6 cannot be counted. So far 77 ballots have been mailed and 7 returned.
In person absentee voting. You can come to the town hall any weekday from Tuesday March 23 through Friday, April 1; from 10 am to noon or 2 pm to 4 pm. If none of those times work for you, just call or text 608-424-3848 to make an appointment for some other time.
No Land Use Committee meeting in March, 2021
No applications for public hearing before the Land Use Committee were received as of March 8, 2021. The March meeting of the committee has been cancelled. The next meeting is scheduled for April 26, 2021, with applications due by April 12, 2021.
Another remodel pic
As of Monday morning, March 8, 2021, we have a wallboarded ceiling ready for next steps.
Remy Road Bridge resurfacing project
The Remy Road bridge will be resurfaced this spring. Currently the anticipated start date is March 29, 2021 with completion anticipated to be completed by May 21, 2021. The bridge will be re-decked, and will receive a new railing.
This is a project being undertaken jointly by the Village of Belleville and the Town of Montrose. The Town has secured 70% funding from the State of Wisconsin under a Municipal State Agreement (MSA), which will help to offset the cost to the two municipalities. The Village was instrumental in helping the Town obtain the funding.
Remodeling update
We have continued progress to report. After the teardown of the ceiling, the hall has been re-wired, and now is set for next steps, which should be insulation and sheet rocking the ceiling. The new ceiling will be about 2 feet higher than the old one, and the lighting will be dimmable LEDs.